Ghana NDC evidence portal
Article 6 qualification
Screen source-backed candidate information using the approved qualification fields and filters.
74 candidates foundThese are qualification records, not authorisations.
| Candidate | POA type | Column V | Column W | Quantification | Completeness | ERP to 2035 |
|---|---|---|---|---|---|---|
| A6-026Establish 650 renewable mini-grids, prioritising island, lakeside and remote communities | Revised NDC | EPL | T2 | Both periods | 5/5 | 133.69 |
| A6-027Switch liquid fuels to natural gas in thermal power plants | Original NDC | NL | T1 | Both periods | 5/5 | 4,450.00 |
| A6-028Convert simple-cycle gas plants to combined-cycle | Original NDC | NL | T1 | Both periods | 5/5 | 909.76 |
| A6-029Hydropower rehabilitation and climate resilience | Revised NDC | NL | T1 | Both periods | 5/5 | 1,189.85 |
| A6-030Sustainable biomass/biogas power | New NDC | PL | T2 | Both periods | 5/5 | 1,804.81 |
| A6-031Waste-to-energy electricity | New NDC | PL | T2 | Both periods | 5/5 | 885.96 |
| A6-032Grid modernization & loss reduction | New NDC | NL | T1 | Both periods | 5/5 | 885.96 |
| A6-033Railway Development and Road-to-Rail Modal Shift Programme for Ghana | Revised NDC | WL | T3 | Both periods | 5/5 | 43.38 |
| A6-034Expansion and renewal of inter- and intra-city transportation modes through low-emission mass transit, public and commercial fleet renewal. | Revised NDC | PL | T2 | Both periods | 5/5 | 2,492.46 |
| A6-035Electric bus deployment | Revised NDC | EPL | T2 | Both periods | 5/5 | 237.80 |
| A6-036Adoption of electric vehicles | Revised NDC | EPL | T2 | Both periods | 5/5 | 7,900.10 |
| A6-037Ghana light rail development programme | Revised NDC | WL | T3 | Both periods | 5/5 | 4,729.07 |
| A6-038Improve municipal solid-waste collection and reduce open burning/dumping | Revised NDC | NL | T1 | Both periods | 5/5 | 3,726.54 |
| A6-039Valorise recyclable materials through MRFs and recycling hubs | New NDC | WL | T3 | Both periods | 5/5 | 1,344.00 |
| A6-040Develop circular textile management and recycling | New NDC | WL | T3 | Not quantified | 3/5 | 0.00 |
| A6-041Expand effective waste-to-compost capacity | Revised NDC | EPL | T2 | Both periods | 5/5 | 1,562.20 |
| A6-042Develop anaerobic digestion for source-separated organics | New NDC | PL | T2 | Both periods | 5/5 | 681.64 |
| A6-043Build engineered sanitary landfills | Revised NDC | PL | T3 | Not quantified | 3/5 | 0.00 |
| A6-044Recover and destroy landfill methane | Revised NDC | PL | T2 | Both periods | 5/5 | 1,515.54 |
| A6-045Close and rehabilitate priority dumpsites | New NDC | NL | T1 | Not quantified | 3/5 | 0.00 |
| A6-046Integrated management of wastewater and faecal sludge treatment facilities for methane mitigation | New NDC | PL | T2 | Not quantified | 3/5 | 0.00 |
| A6-047Promotion of resource recovery and reuse of by-products of treated wastewater and faecal sludge | New NDC | EPL | T2 | Not quantified | 3/5 | 0.00 |
| A6-048Scaling-up jurisdictional REDD+ (J-REDD+) | New NDC | EPL | T2 | Both periods | 5/5 | 30,000.00 |
| A6-049Ghana Cocoa Forest REDD+ Programme (GCFRP) | Original NDC | NL | T1 | Both periods | 5/5 | 50,000.00 |
| A6-050Ghana Shea Landscape Emission Reduction Project | Original NDC | NL | T1 | Both periods | 5/5 | 16,135.00 |