Ghana NDC evidence portal
Implementation and progress
Report what has been delivered, compare actuals with targets and identify gaps requiring action.
Reporting coverage
Published records by reporting status
| POA | Indicator | Baseline | 2030 target | Latest actual | Reporting status |
|---|---|---|---|---|---|
| PoA91 · Implement Integrated Risk Monitoring and Early Warning Systems | Operational climate-health early warning modulesSystems/modules | 0.00 | 4.00 | — | Actual value not supplied |
| PoA92 · Strengthen Sustainable and Climate-Resilient Supply Chains | Supply-chain risk assessments and continuity plansAssessments/plans | 0.00 | 16.00 | — | Actual value not supplied |
| PoA93 · Promote Climate-Resilient and Sustainable Technologies and Infrastructure | Hospitals upgraded/certified as green and climate-resilientHospitals | 0.00 | 30.00 | — | Actual value not supplied |
| PoA94 · Promote energy efficiency in the steel industry | Steel factories retrofittednumber | 0.00 | 15.00 | — | Actual value not supplied |
| PoA95 · Promote green transition in the cement industry | Cement clinker ratio reductionpercentage points | 0.00 | 0.40 | — | Actual value not supplied |
| PoA96 · Promote sustainable palm oil production and efficient agro-processing | Palm oil mills upgradednumber | 12.00 | 110.00 | — | Actual value not supplied |
| PoA97 · Enhance climate services for efficient weather information management. | Operational / reactivated/new automatic weather stationsNo. | 45.00 | 320.00 | — | Actual value not supplied |
| PoA98 · Reducing risk in smallholder farmers (risk transfer). | Farmers reached by drought advisories/risk financeNumber | — | 1,500,000.00 | — | Actual value not supplied |
| PoA99 · Establishment of Safe Havens | Safe havens equipped to standard% of safe havens | — | 0.70 | — | Actual value not supplied |
| PoA100 · Upgrade Existing 21 Emergency Operation Centre | Functional Emergency Operation CentresNumber | 10.00 | 15.00 | — | Actual value not supplied |
| PoA101 · Enhance reslience of women and The vulnerable | Priority sectors with sex-disaggregated climate datasetsSectors | 0.00 | 8.00 | — | Actual value not supplied |
| PoA102 · National Biochar Programme (NBP) | Biochar producedt biochar/year | 0.00 | 1,618,705.04 | — | Actual value not supplied |
| PoA103 · National Enhanced Rock Weathering Programme | Certified material applied during year under approved protocolt rock/year | 0.00 | 100,000.00 | — | Actual value not supplied |
| PoA104 · CCUS Readiness, Demonstration and Deployment Programme | Number of CCUS pilotsNo. | 0.00 | 2.00 | — | Actual value not supplied |
| PoA105 · Upstream flare reduction & associated gas utilisation | Avoided flared volume (10^6 m3/yr)(10^6 m3/yr) | 0.00 | 41.34 | — | Actual value not supplied |
| PoA106 · Refinery & gas-processing methane and flare reduction | Avoided flared volume (10^6 m3/yr)(10^6 m3/yr) | 0.00 | 1.61 | — | Actual value not supplied |
| PoA107 · Pipeline & distribution leak detection and repair (LDAR) | Distribution throughput (10^6 m3/yr)(10^6 m3/yr) | 206.71 | 206.71 | — | Actual value not supplied |
| PoA108 · Scaling-up 50,000 waste-to-energy biodigesters | Biodigesters installedunits | 100.00 | 30,000.00 | — | Actual value not supplied |
| PoA109 · Enhanced protection and resilience of blue carbon ecosystems along Ghana's coastline | Coastline protectedkm | 22.94 | 45.94 | — | Actual value not supplied |
| PoA110 · National Green AC Cooling Programme | Green ACs in useunits | 45,000.00 | 150,000.00 | — | Actual value not supplied |
| PoA111 · Green multimodal logistics and inland-water transport | Freight shifted from road to lake/railmillion t-km/year | 0.00 | 1,400.00 | — | Actual value not supplied |
| PoA112 · Industrial and agro-processing decarbonisation | Average clinker substitution in participating productionpercent | 0.00 | 4.00 | — | Actual value not supplied |
| PoA113 · Underwater timber salvage and lake navigation | Traceable submerged timber recoveredm3/year | 0.00 | 12.00 | — | Actual value not supplied |
| PoA114 · Circular resource systems | Organic waste diverted to controlled treatmenttonnes/year | 5.00 | 20.00 | — | Actual value not supplied |
| PoA115 · Climate-smart agriculture, irrigation, fisheries and cold chains | Efficient climate-resilient irrigationhectares | 0.00 | 25.00 | — | Actual value not supplied |
| PoA116 · Renewable energy, storage and reliable 24-hour power | Battery energy storage commissionedMWh | 0.00 | 4.00 | — | Actual value not supplied |
| PoA117 · Low-carbon tourism and blue economy | Climate-resilient tourism clusters operationalnumber | 10,000.00 | 50,000.00 | — | Actual value not supplied |
| PoA118 · Watershed, ecosystem and biodiversity resilience | Watershed/riparian area restored or protectedhectares | 0.00 | 250,000.00 | — | Actual value not supplied |
| PoA119 · National Agroforestry Development Programme | Area under agroforestryha | 507,000.00 | 2,610,000.00 | — | Actual value not supplied |
| PoA120 · Water Purification Programme | Installed systemsno | 0.00 | 1,222.00 | — | Actual value not supplied |